Twitter Facebook Youtube Instagram LinkedIn

Motor Vehicle Charges

TAMP order dated 19 May 2014, Gazzette No. 137, New Delhi

Charges on motor vehicles or any other types of equipment passing through the port

Stevedoring charges

#ItemRate per vehicle/equipment (in Rs.)Coastal Rate (in Rs.)
01 Import/Export 49.00 29.00
02 Transhipment 56.00 33.00

Wharfage charges

Sr. No. Item Rate as a % of the following Coastal Rate (in Rs.)

  • Import 0.50% of the CIF Value 0.30% of Coastal Bill of Lading Value
  • Export 0.50% of the FOB Value 0.30% of Coastal Bill of Lading Value
  • Transhipment 0.65% of the CIF/FOB Value 0.195% of Coastal Bill of Lading Value

Dwell time charges

Import/Export/Transhipment

#DaysThe gross weight of the motor vehicle/equipment in MT
< 1.0 >= 1.0 / <= 5.0 >= 5.0 / <= 10.0 >= 10.0
Rate per day/per vehicle or equipment
01 1-15 days Free Free Free Free
02 16-30 days 35.00 70.00 140.00 280.00
03 Thereafter 70.00 140.00 280.00 560.00

Back To Town

#DaysThe gross weight of the motor vehicle/equipment in MT
< 1.0 >= 1.0 / <= 5.0 >= 5.0 / <= 10.0 >= 10.0
Rate per day/per vehicle or equipment
01 0-3 days Free Free Free Free
02 4-14 days 35.00 70.00 140.00 280.00
03 15-21 days 70.00 140.00 280.00 560.00
04 Thereafter 140.00 280.00 560.00 1,120.00

Note:

The Dwell time charges shall be levied for storage inside the Port other than the area leased out for the storage of cars.

Dwell time for import/transhipment of motor vehicles shall be calculated from the day following the last day of landing.

Dwell time for export/back to the town of motor vehicles shall be calculated from the day following the day of receipt in the JNPA.

The port user will have to pay an amount equivalent of 0.5% of FOB/CIF value as the case may be in addition to the wharfage charges as mentioned above if the ports equipment is used for loading/unloading of motor vehicles.

Any vehicle meant for export taken back to town for any reason is termed as back to town vehicle and will be subject to dwell time as given in the above schedule.

Shut out charges for not loading on the vessel for which the vehicle/equipment is brought in is Rs.50 per vehicle/equipment.

Recovery charges for use of specialized infrastructure for receiving and handling vehicles arriving by train

# Description Rate per vehicle (in Rs.)
01 Motor Vehicles of less than 16.5 HP 273.00
02 Motor Vehicle of Rs.16.5 HP or above 406.00